Updated architectural brief
One shared level.
A centre, then quieter edges.
Simple construction, a generous shared beginning and room to grow over years. The circle organises people; it does not require every room or roof to be round. This is a design brief, not a surveyed plan.
01 · Arrive together
Arrive directly into a welcoming common area, with a shared table, water and a place to leave shoes and bags. Kitchen and service rooms sit at the edge. The first impression is shared life, not a corridor of private accommodation.
02 · Keep the circular floor clear
Give the common room priority over bedroom count. Its central gathering area supports yoga, breath, singing, meditation and ecstatic dance at different times. A circular arrangement of people fits inside an organic or rectangular shell. Perimeter storage keeps the floor adaptable; capacity awaits layout and safety review.
03 · Open onto the hearth and growing garden
Open structural bays, selective glazing and shaded timber edges face a separate outdoor fire circle. The common floor, veranda and hearth court should connect at the same level without a sunken pit or stepped seating. Keep fire outside the movement area and roof footprint, with clear circulation and professionally designed separation. Beyond: kitchen herbs, food beds, a nursery and possible fruit planting.
04 · Let privacy develop outward
A legible garden route branches toward closable work or rest rooms and, later, simple sleeping huts. Screens and planted edges offer privacy without turning the commons into internal corridors. Quiet rooms should not become passageways to events, kitchens or the dome. Actual spacing and sound separation depend on the site.
05 · Add the small outdoor dome last
A separate sound/steam study for no more than six people, subject to a potentially lower approved limit. Plan changing, rinsing, maintenance and emergency access before selecting its shape. Dry sound and wet steam are distinct operating states; separate enclosures remain an option.
Single-level use is a site-selection and design priority, not a promise to flatten steep land. Confirm topography, drainage, access and buildable area before a land commitment. No footprint, budget or construction capacity is established here.